Discover

Water and irrigation in Bazma

Irrigation is central to the oasis and has been the subject of a rehabilitation program.

Essential infrastructure for the oasis

The rehabilitation project for the Bazma irrigated perimeter, documented under PISEAU II, aimed to improve hydraulic infrastructure, rationalize water use and make better use of available resources.

The documented works included replacing 5,242 linear metres of old distribution pipes with HDPE pipes, building a 50 m³ water divider 10 metres high, and constructing a protective fence around the borehole.

The document also emphasizes better organization of water use, improved irrigation-water quality and support for farmers.

Source: CRDA Kebili, Bazma irrigated-perimeter rehabilitation project.